Reference
Here are some of the projects we have helped our clients to implement-
-
Františkovy Lázně AQUAFORUM a.s.
Preparation of a water audit for the implementation of pool water recycling and reuse in the indoor pool facility.Naše služby
Preparation of a water audit. -
City of Rudna
Evaluation of the current status of the wastewater treatment plant in terms of development options reflecting the development in the context of wastewater disposal and management for the Rudná agglomeration.Naše služby
Implementation of the wastewater treatment plant study. -
Vodárenská akciová společnost a.s.
Deployment of measurements at the WWTP within the AWCS 4.0 project. Simulation of wastewater treatment plant operation using a mathematical model. Evaluation of the existing condition, verification of proposed changes to the WWTP.Naše služby
Optimisation of the operation of the WWTP. -
SAKO Brno, a.s.
Reconstruction of the waste-to-energy plant with a capacity of 230 thousand CZK. tonnes of waste per year within the framework of the waste management of the city of Brno in the total amount of 1800 mil. CZK. It received a 45% EU ISPA grant.Naše služby
Comprehensive consultancy within the project. -
SAKO Brno, a.s.
The project implements the power output of the incinerator SAKO Brno, a.s. by means of a new hot water exchanger station (HVS) and by outputting the hot water (HV) output through a new pipeline to the adjacent urban area of Líšeň and Vinohrady. The total investment was CZK 190 million. CZK. It received a 30% subsidy from OP PIK.Naše služby
Comprehensive consultancy within the project. -
SAKO Brno, a.s.
Construction of a ZEVO facility as a continuation of the OHB project with a capacity of 120,000 m3. tonnes of waste per year. The investment cost of the project is expected to be 1700 mil. CZKNaše služby
Comprehensive consultancy within the project. -
SAKO Brno, a.s.
Waste prevention in Brno. The project is divided into four waste prevention components: the RE-TEX, biodegradable waste, RE-NAB and "Second Life". The cost of the project was CZK 17 million. CZK. It received 85% subsidy from the OP Environment.Naše služby
Comprehensive consulting within the project, securing subsidies and more. -
Union VKMO s.r.o.
The project dealt with the construction and reconstruction of sewers and wastewater treatment plants in ten agglomerations for a total amount of CZK 1,500 million. CZK. It received a 68% subsidy from the EU ISPA and a 5% subsidy from the SFŽP.Naše služby
Comprehensive consulting within the project, securing subsidies and more. -
Union VKMO s.r.o.
The project is a continuation of the previous Dyje River Basin Water Protection Project and consists of 11 sub-projects. The total cost of the project exceeded CZK 1,436 million. CZK. The project received a 72% subsidy from the Cohesion Fund.Naše služby
Comprehensive consulting within the project, securing subsidies and more.
-